At the beginning of September we received work on the Drzewiany site. There are 8 dams on this site, which are designed to ensure the proper level of hydration of the fen. Previously on this fen conservation measures were conducted in the form of a one-time mowing and removal of trees and shrubs. In this way, we hope to improve the conservation status of habitat in the area of about 21 ha.
This text is also available in: PL